Click on photos for larger images

Assembly - takes less than 1 minute per metre to erect!

Assembly is remarkably simple and a 4m system can be fully assembled in no more than 4 minutes by a single operative standing upon the ground and without the need for ANY tools at all.

There are just 4 steps:

STEP 1

Using a Double Staybill at the end or return if required, set out using the spacer bars. Then lay the scaffold boards and load materials.

STEP 2

Insert the Posts - hooks facing the boards - and place Ladder Restraint adjacent to the end/return.

STEP 3

Hang the solid panels under the Ladder Restraint leaving alternative gaps for the hinged panels if required, then hang the hinged panels.

STEP 4

Secure the ladder and use the safety gate.

Staybills - our factory fitted version only needs posts to be inserted and our "all-in one" panels to be hung to form your fall protection

Our "all in one" panels have the handrail, toeboard and full mesh protection in a single easy to use panel

BUY or HIRE

Copyright Staybills 2004- 2012